free hit counter

Toshiba TECRA A9 Series Maintenace Manual page 288

Toshiba tecra a9 series; tecra s5; tecra p5; satellite pro s200 notebook
Hide thumbs Also See for TECRA A9 Series:
Table of Contents

Advertisement

4.20 System board
4 Replacement Procedures
Installing the System board
To install the system board, follow the steps below and refer to Figure 4-32 to 4-34.
NOTE: When installing a new system board (front), make sure that the insulators, screws
and CPU back plate assemblies are placed as shown in the following figure.
(Front of the system board)
TECRA A9/TECRA S5/TECRA P5/Satellite Pro S200 Maintenance Manual (960-633) [CONFIDENTIAL] 4-57

Advertisement

Table of Contents
loading

This manual is also suitable for:

Satellite pro s200Tecra p5Tecra s5

Table of Contents