Installing the Switch
Installation Procedures
2.
Figure 2-4. Checking the LEDs on the 2510G-24 (J9279A)
Figure 2-5. Checking the LEDs on the 2510G-48 (J9280A)
LED Behavior:
2-10
Check the LEDs on the switch as described below.
Switch port LEDs
Power, Fault
Test LED
and locator
LEDs
Switch port LEDs
Power and
Test LED
Fault LEDs
When the switch is powered on, it performs its diagnostic self test. Self
test takes approximately 50 seconds to complete.
During the self test:
•
Initially, all the switch and port LEDs are on. Most of the LEDs go off
and then may come on again during phases of the self test.
•
For the duration of the self test, the Test LED stays on.