free hit counter

Test Procedure - Sharp R-508FS Supplemental Service Manual

Hide thumbs Also See for R-508FS:
Table of Contents

Advertisement

R - 5 0 8 F S
PROCEDURE
LETTER
J
KEY UNIT TEST
1. Disconnect the power supply cord, and then remove outer case.
2. Open the door and block it open.
3. Discharge high voltage capacitor.
4. Isolate the key unit with the control panel frame to be tested.
5. Using an ohmmeter and referring to the key unit matrix indicated on the control unit circuit, check the
circuit between the pins of the key unit that correspond to the STOP/CLEAR pad. When the pad is
pressed, the ohmmeter should indicate short circuit. When the pad is released, the ohmmeter should
indicate open circuit. If incorrect readings are obtained, the key unit is faulty and must be replaced. About
the other pads, the above method may be used
6. Reconnect all leads removed from components during testing.
7. Re-install the outer case (cabinet).
8. Reconnect the power supply cord after the outer case is installed.
9. Run the oven and check all functions.
8
P OP C OR N
TEST PROCEDURES
COMPONENT TEST
7
6
5
1
DE F R OS T
4
C OOK
7
R E HE AT
Key Unit
4
3
2
2
S T AR T
T IME R
5
9
C LOC K
S T OP
8
3
C LE AR
P OWE R
0
6
LE V E L
6
1
MINUT E
P LUS

Advertisement

Table of Contents
loading