free hit counter

Installing The Discharge Chute; Installing The Upper Handle - Husqvarna ST 111 Operator's Manual

Table of Contents

Advertisement

2. Installing the Discharge Chute

Procedure
1. Install the chute deflector to the discharge chute using
bolts and, washer, nut, deflector knob and cap plunger
(Figure 4).
2. Install the discharge chute to the chute base using
three screws and nuts.
8
7
4
5
10
3
1. Deflector
2. Carriage bolts
3. Flange nuts 5/16-18
4. Washer
5. Knob
IMPORTANT: Do not overtighten the flange nuts; other-
wise you may damage the discharge chute.
9
1
6
3
2
2
Figure 4
6. Discharge chute
7. Carriage Bolt
8. Shoulder Bolt
9. Flange nuts 1/4-20
10. Cap Plunger
ASSEMBLY

3. Installing the Upper Handle

Cover
1. Install the upper handle cover to the handles using four
screws (Figure 5).
1
1. Upper handle cover
2. Screws
6
2
Figure 5

Advertisement

Table of Contents
loading