free hit counter

Toro Z355 Z-Master Operator's Manual page 22

Z-master with 48 in. mower and bagger
Hide thumbs Also See for Z355 Z-Master:
Table of Contents

Advertisement

9. Remove shoulder bolts (3/8 x 7/8 inch) and locknuts
(3/8 inch) securing spring end plate assemblies to
carrier frame (Fig. 24).
Figure 24
1. Spring assembly
2. Shoulder bolt, 3/8 x
7/8 inch
10. Remove the block under the carrier frame.
11. Tilt carrier frame down.
12. Remove the two nuts and bolts that hold the bar for
rubber guard. The bar is under the motion control
levers. Fold the rubber guard onto the footrest (Fig.
25).
3
4
2
Figure 25
1. Bar
2. Rubber guard
3. Nut
13. Remove hairpin cotters and pivot pin assemblies from
push arms at traction unit pivot brackets (Fig. 26).
3
2
1
m–3209
3. Locknut, 3/8 inch
1
5
m–4858
4. Machine panel
5. Screw
Note: Save all hardware for use when installing mower.
Items 3 and 4 are part of traction unit.
2
4
Figure 26
1. Pivot bracket
2. Push arm
Note: Drive shaft remains with traction unit.
14. Drive roll pin through hole in PTO drive shaft to
separate from gearbox shaft (Fig. 27).
4
3
Figure 27
1. PTO drive shaft
2. Universal joint
15. Move deck and carrier frame away from traction unit.
Important
Remove drive shaft from gearbox shaft if
you do not hook up a deck immediately or when putting
on optional attachments.
16. Remove 2 bolts (3/8 x 1-5/8 inch) and locknuts (3/8
inch) from universal joint and slide the drive shaft off
gearbox shaft (Fig. 28).
22
1
m–4870
3. Pivot pin assembly–flat
4. Hairpin cotter
1
2
M–4532
3. Gearbox shaft
4. Roll pin
3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents