3-18. LOADING SW BOARD, LOCK SW BOARD
Note during re-assembling
When re-assembling the
LOADING SW board and
LOCK SW boards,
align the leads position as shown.
LOADING SW board
LOCK SW board
2 screw
(BVTP3 × 8)
9 LOCK SW
board
claws
Leads
position
1 Rotate the pulley (400) in the
direction of the arrow
3 Rotate the pulley (400) in the
direction of the arrow
A
B
8 screw
(BVTP 3 × 8)
CDP-M400CS
A
fully.
B
fully.
7 gear (center)
5 tapping screw
4 belt
6 pulley (400)
0 screw
(BVTP 2.6 × 8)
qa LOADING SW
board
17