free hit counter

Mitsubishi Electric PCA-RP2GA Technical & Service Manual page 51

Hide thumbs Also See for PCA-RP2GA:
Table of Contents

Advertisement

PCA-RP2.5GA
PCA-RP3GA
70
Electrical box
7
2
226
Air intake
Electrical box
2
3
When electrical
box is pulled
down
1240 (suspension bolt pitch)
1290
1214
1310
Air outlet
1228
[ Front view ]
5
8
Ceiling
86
138
171
263
525
416
1235
NOTES:
1. Use M10 or W3/8 screws for anchor bolt.
2. Please be sure when installing the drain-up machine (option parts).
Refrigerant pipe will be only upper drain pipe arrangement.
6
140
70
161
90
1 4
1 Drainage pipe connection (26mm I.D.)
2 Drainage pipe connection (for the left arrangement)
3 Knock out hole for left drain-piping arrangement
4 Refrigerant-pipe connection (gas pipe side/flared connection)
5 Refrigerant-pipe connection (liquid pipe side/flared connection)
6 Knock out hole for upper drain pipe arrangement
7 Knock out hole for left drain pipe arrangement
8 Knock out hole for wiring arrangement
51
Unit : mm
85
15
182
(3/8F liquid)
201
(5/8F gas)
241
(Drainage)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pca-rp2.5gaPca-rp4gaPca-rp3gaPca-rp5gaPca-rp6ga

Table of Contents