free hit counter

Mitsubishi Electric PDFY-10NMU-A Technical & Service Manual page 21

Table of Contents

Advertisement

8-5 THERMISTOR (Gus piping temperature detection)
OPERATING PROCEDURE
1.Removing the cover
(1)Remove the fixing screw of the cover(J) and
remove the cover.
2.Removing the thermistor
(1)Remove the thermistor(K), from the thermistor
holder(L), which are installed on the copper tube.
PHOTOS
(J)
(K),(L)
Fig.1
Fig.2
19

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents