Table 1. Service Processor Checkpoints. (continued)
Checkpoint
Description
E023
Accessing memory card VPD
E025
Service processor accessing VPD.
E026
Service processor accessing VPD.
E030
Beginning to build I
E031
Finished building I
E032
JTAG self-test
E040
Starting serial port tests
E042
Configuring serial port 1
E043
Configuring serial port 2
E044
Preparing to set serial port line speed
E045
Preparing to disconnect serial port
E050
Reading system VPD
Action/ Possible Failing FRU
Replace the memory card
Location: P1-M1
Replace the system board.
Location: P1
(See note 3 on page 115.)
Replace the system board.
Location: P1
(See note 3 on page 115.)
2
C resources
1. Replace the processor card.
2. Replace the system board.
2
C resources
Replace the system board.
Location: P1
(See note 3 on page 115.)
Replace the system board.
Location: P1
(See note 3 on page 115.)
Replace the system board.
Location: P1
(See note 3 on page 115.)
Replace the system board.
Location: P1
(See note 3 on page 115.)
Replace the system board.
Location: P1
(See note 3 on page 115.)
Replace the system board.
Location: P1
(See note 3 on page 115.)
Replace the system board.
Location: P1
(See note 3 on page 115.)
Operator panel.
Location: L1
(See note 2 on page 115.)
Location: P1-C1
Location: P1
(See note 3 on page 115.)
Chapter 4. Checkpoints
87