EPSON WorkForce 600/EPSON Stylus OFFICE TX600FW/BX600FW/EPSON Stylus SX600FW/ME OFFICE 700FW
When routing the the PE Sensor cable, route it outside the the
PF Encoder FFC as shown in the following figure.
Figure 4-24. Routing the PE Sensor cable
When installing the Main Board Unit, tighten the screws in the
order given in
Figure.
When routing the Head FFCs, follow the steps below.
1. Route the Head FFCs through the space between the Left
Frame and the MB Lower Shield Plate.
2. Connect the Head FFCs to connectors CN4, 5, 21 on the Main
Board. (See
Figure.
3. Route the Head FFC aligning it with the line mark on the MB
Lower Shield Plate, and secure it with double-sided tape.
4. Align the ferrite core with the line mark of the MB Lower Shield
Plate, then secure it with double-sided tape.
Back side of Main Board Unit
Fold
Line mark
Double-sided tape
Figure 4-25. Routing the Head FFCs
DISASSEMBLY/ASSEMBLY
PF Encoder FFC
PE Sensor cable
4-22.
4-21.)
Left Frame
MB Lower Shied Plate
Ferrite core
Removing the Circuit Boards
Disassembling the Main Board Unit
1.
Remove the Wireless LAN Module.
(Refer to
"4.4.2 Wireless LAN Module
2.
Remove the screws (x4) and remove the MB Upper Shield Plate.
MB Upper Shield Plate
1
4
2
Figure 4-26. Removing the MB Upper Shield Plate
Revision A
(p105)")
3
C.P. 3x4, F/Zn-3C (1.6-1.7kgfcm)
C.B.S. 3x8, F/Zn-3C (4±0.5kgfcm)
C.B.S. 3x6, F/Zn-3C (4±0.5kgfcm)
Positioning hole and dowel
103
Confidential