Installing or Replacing Components
S e n d d o c u m e n t c o m m e n t s t o u c s - d o c f e e d b a c k @ c i s c o . c o m
Install a new drive:
Step 2
a.
b.
c.
d.
Figure 3-6
1
3
Installing Power Supplies
The qualified and supported part numbers for this component are subject to change over time. For the most
up-to-date list of replaceable components, see the following URL and navigate to the page for your server
model and generation:
http://www.cisco.com/en/US/prod/ps10265/ps10493/c-series_part_numbers.html
To replace or install a power supply, follow these steps:
If you have ordered a server with power supply redundancy (at least two power supplies), you do not
Note
have to power off the server to replace power supplies because they are hot pluggable.
Remove a power supply or a blank panel from an empty bay:
Step 1
a.
b.
Cisco UCS C210 Server Installation and Service Guide
3-14
Place the drive in the sled with the connectors facing the rear.
Install the four securing screws on the sides of the sled.
With the ejector lever still open, push the sled into the drive bay until you feel the drive stop against
the backplane.
Press the ejector lever flat until the lock clicks into place.
Removing and Replacing Hard Drives and SSDs
3
3
Release button
Securing screws (four on sides of sled)
Do one of the following actions:
If your server has only one power supply, shut down and power off the server as described in
–
the
"Shutting Down and Powering Off the Server" section on page
If your server has two power supplies, the power supplies are hot pluggable so you do not have
–
to shut down the server.
Remove the power cord from the power supply that you are replacing.
1
2
3
3
2
Ejector lever
Chapter 3
Maintaining the Server
3-7.
OL-20887-02