GENERAL INSTALLATION GUIDELINES
Mounting of Indoor Unit
Drilling Piping Hole in the Wall
Follow the piping clearance recommendations as shown on the
installation template.
ø
1. Using a 2 5/8 (
65mm) inch hole core drill bit, drill a hole at
either the right or left side of the wall mounting (Figure 10).
• The slant of the hole should be 3/16" to 5/16" from level with the
slant being upward on the indoor unit side and downward on the
outdoor unit side.
2. Finish off the newly drilled hole as shown with bushing and
sleeve covering.
• Sleeve and bushing prevents damage to the tubing/bundling of the
piping.
See Refrigerant Piping Connections for Indoor Unit on page
52 to proceed with piping.
See "Overview - Connecting Indoor Unit Electrical Wiring"
on page 50 to proceed with electrical connections.
20
Due to our policy of continuous product innovation, some specifications may change without notification.
©LG Electronics U.S.A., Inc., Englewood Cliffs, NJ. All rights reserved. "LG" is a registered trademark of LG Corp.
Figure 11: Installation Plate Screws
Indoor
Core Drill
Bushing
Sleeve
WALL
Outdoor