4.5.2 Mechanical Installation

The switch platform can be rack mounted and is designed for installation in a standard 19" rack.
The power side of the switch includes a hot-swap power supply module, a blank cover, and a hot-
swap fan tray. There are two possible air flow directions. Be sure that the switch air flow direction
is compatible with your system, rack, and PSU. The connector side of the switch has the data ports,
system LEDs, and management connection ports.
The switch platform contains auto-sensing 100 - 240 VAC connections for the PSU.
28
Mellanox Technologies
There is a risk of explosion should the battery be replaced with a battery of an incorrect
type.
Dispose of used batteries according to the instructions.
Caution – Use of controls or adjustment or performance of procedures other than those
specified herein may result in hazardous radiation exposure.
CLASS 1 LASER PRODUCT and reference to the most recent laser standards:
IEC 60 825-1:1993 + A1:1997 + A2:2001 and EN 60825-1:1994+A1:1996+ A2:2001
Caution: Slide/rail mounted equipment is not to be used as a shelf or a work space.
For North American power connection, select a power supply cord that is UL Listed
and CSA Certified
3 - conductor, [18 AWG], terminated in a molded on plug cap rated at 125 V, [15 A],
with a minimum length of 1.5m [six feet] but no longer than 4.5m
For European connection, select a power supply cord that is internationally
harmonized and marked "<HAR>",
3 - conductor, minimum 0,75 mm2 wire, rated at 300 V, with a PVC insulated jacket.
The cord must have a molded on plug cap rated 250 V, 10 A.