free hit counter

Upgrading Or Replacing Processors; Required Tools - Fujitsu PRIMERGY TX300 S7 Upgrade And Maintenance Manual

Table of Contents

Advertisement

Ê Reconnect the AC power cords to the power supply units and secure them
with PSU cable brackets as described in section
the mains" on page
Ê If available, update the system board BIOS and the iRMC to the latest
version as described in section
BIOS and iRMC" on page
Ê Enable boot watchdog functionality as described in section
boot watchdog functionality" on page
Ê If BitLocker functionality is used and has been disabled before starting the
maintenance task, re-enable BitLocker as described in section
BitLocker functionality" on page
11.4

Upgrading or replacing processors

Field Replaceable Units (FRU)
Average hardware task duration: 15 minutes
Average software task duration: 5 minutes
V
CAUTION!
Processors are extremely sensitive to electrostatic discharge and must
be handled with care. After a processor has been removed from its
protective sleeve or from its socket, place it upside down on a
nonconducting, antistatic surface. Never push a processor over a
surface.

11.4.1 Required tools

Preliminary and concluding steps: tool-less
Removing and installing the processor heat sink:
– Phillips PH2 / (+) No. 2 screw driver
Upgrading or replacing the processor: tool-less
TX300 S7 / RX350 S7
125.
"Updating or recovering the system board
139.
156.
Upgrade and Maintenance Manual
"Connecting the server to
150.
Processors
"Enabling SVOM
"Enabling
575

Advertisement

Table of Contents
loading